足球胜负预测(www.99cx.vip)_PM says opening of MRT Putrajaya line to revitalise development along route

时间:1个月前   阅读:21   评论:1

足球胜负预测www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。足球胜负预测上足球分析专家数据更新最快。足球胜负预测开放皇冠官方会员注册、皇冠官方代理开户等业务。

,Prime Minister I *** ail Sabri Yaakob speaks at the launch of the Putrajaya Line Mass Rapid Transit at Stesen MRT Kampung Batu in Kuala Lumpur. – The Malaysian Insight pic by Nazir Sufari, June 16, 2022.

THE opening of the Mass Rapid Transit (MRT) Putrajaya Line is expected to trigger and revitalise development in old, existing areas, as well as areas yet to be developed, said Prime Minister I *** ail Sabri Yaakob. 

He said with the opening of the new line, the government was confident that areas located along the route, such as Jinjang, Sungai Buloh, Kepong and Bandar Sri Damansara, could develop more rapidly to be on par with other areas.

“The MRT Putrajaya Line Phase 1 involves the route from Kwasa Damansara to Kampung Batu, while Phase 2, which is almost fully completed, involves the route from Kampung Batu to Putrajaya.

“The Phase 2 route will run across strategic areas including Kuala Lumpur city centre with underground stations at Titiwangsa, Kuala Lumpur Hospital, Ampang Park, Persiaran KLCC and Tun Razak Exchange (TRX),” he said at the launch of the MRT Putrajaya Line Phase 1 at Kampung Batu MRT station in Kuala Lumpur today.

Also present were Finance Minister Zafrul Tengku Abdul Aziz, Transport Minister Dr Wee Ka Siong, Minister in the Prime Minister’s Department (Economy) Mustapa Mohamed and Federal Territories Minister Shahidan Kassim. 

I *** ail Sabri said the MRT Putrajaya Line was expected to become the catalyst for improving connections between residents and communities, especially those living close to the line.

“It will be easier for the people to travel and commute to work, to socialise and to access other public facilities,” he said.

The prime minister said the 57.7km MRT Putrajaya Line has 36 stations comprising 27 elevated stations and nine underground stations with a total construction cost of RM30.53 billion.

In celebration of the line’s opening, I *** ail Sabri also announced one-month free rides on all public transport operated by RapidKL, namely MRT, Light Rail Transit  (LRT), Bus Rail Transit (BRT), Monorel and RapidKL buses, starting today.

“I hope members of the Malaysian Family will take this opportunity to try using public transport by parking their cars at the Park N Ride facility and take a ride on the MRT,” he said. 

I *** ail Sabri said the full opening of the MRT Putrajaya Line was expected to record an initial daily passenger count of over 104,000 and was hoped to reduce traffic congestion currently plaguing the capital.

上一篇:www.a55555.net(www.a55555.net)_英超新波复古首季设计

下一篇:皇冠体育信用(www.hg9988.vip)_媒体人:青岛队中锋高世鳌确认转会至天津队

网友评论

  • 2022-07-12 00:00:56

    The next general election is approaching, and the dearth of political leaders in offering a pragmatic vision is frightening.妙不可言啊啊